LGM Industries was engaged to fabricate, supply and transport a recycle cyclone and second stage venturi drier.

South32 Worsley Alumina were replacing the recycle cyclone and second stage venturi drier vessels during the February 2019 calciner 3 shutdown.

 

The scope of work involved in this project included the fabrication, supply and transport of:

Recycle Cyclone:

  • Lower cone sections.
  • Furnace crossover duct section.
  • Cylindrical shell section.
  • Roof section.

Second Stage Venturi Drier:

  • Second Stage Venturi Drier Vessel (including the lower throat section).

Each individual item from the Recycle Cyclone and Second Stage Venturi Drier Vessel required specific internal attachments (refractory anchors).