Our 2,000m² fabrication facility in Bunbury supports our maintenance and construction project scopes. It also allows us to react quickly to our clients’ needs as they become apparent or as a response to an emergency breakdown. Some of our recent fabrication projects are listed below.

Iluka Ilmenite Chain Conveyor

  • Client:

    Iluka Resources Ltd
  • Project:

    Fabricate Ilmenite Chain Conveyor
  • Location:

    Capel, WA
  • Value:

    < $1m
  • Date:

    2019

Iluka Ilmenite Chain Conveyor

Fabrication

  • Client:

    Iluka Resources Ltd
  • Project:

    Fabricate Ilmenite Chain Conveyor
  • Location:

    Capel, WA
  • Value:

    < $1m
  • Date:

    2019

What We Did:

Fabrication and assembly of an 18 m long mild and stainless steel enclosed chain conveyor. The chain conveyor was fabricated and assembled at LGM’s Picton workshop before being installed on-site in Capel.

Solenis Stainless Steel Acrylic Acid Tank

  • Client:

    Solenis Australia
  • Project:

    Fabricate Stainless Steel Acrylic Tank
  • Location:

    Kwinana, WA
  • Value:

    < $1m
  • Date:

    2019

Solenis Stainless Steel Acrylic Acid Tank

Fabrication

  • Client:

    Solenis Australia
  • Project:

    Fabricate Stainless Steel Acrylic Tank
  • Location:

    Kwinana, WA
  • Value:

    < $1m
  • Date:

    2019

What We Did:

Complete fabrication and delivery of a 4.3 m diameter, 9 m tall 304 L stainless steel tank. The tank was fabricated and cladded at LGM’s Picton facility and then transported and landed on-site in Kwinana.


The tank also had a bespoke transport frame fabricated to ensure no deformation occurred during transport and to meet transport height restrictions.

MSP Engineering – ROM Bin

  • Client:

    MSP Engineering Pty Ltd
  • Project:

    Fabricate ROM bin
  • Location:

    Greenbushes, WA
  • Value:

    < $1m
  • Date:

    2018

MSP Engineering – ROM Bin

Fabrication

  • Client:

    MSP Engineering Pty Ltd
  • Project:

    Fabricate ROM bin
  • Location:

    Greenbushes, WA
  • Value:

    < $1m
  • Date:

    2018

What We Did:

LGM fabricated a 7.5m x 9m x 10m high ROM Bin including the installation of Bisalloy wear liners. The ROM Bin was transported to Greenbushes where installation was completed by LGM.