We provide integrated work crews to perform maintenance works for both minor and major plant shutdowns. Some of our recent shutdown maintenance projects are listed below.

Tronox Coke Silo

  • Client:

    Tronox
  • Project:

    Repair of D102 Coke Silo
  • Location:

    Kemerton, WA

  • Date:

    2020

Tronox Coke Silo

Shutdown Maintenance

  • Client:

    Tronox
  • Project:

    Repair of D102 Coke Silo
  • Location:

    Kemerton, WA

  • Date:

    2020

What We Did:

LGM were engaged to supply and site install the coke silo on a seven day shutdown window. The engineering and the laser scanning associated with this project are a significant part of its success. By using the technology the clients major risks for the project could be eliminated before site works commenced.

The shut was scheduled to run for seven days and six nights, but completed successfully in six days and four nights.

The Project Required:

  • Supply detailed drawings for the fabrication of the new coke silo
  • Supply and fabricate the coke silo in LGM workshop
  • Using the site laser scan of the existing structure and equipment the new silo was also laser scanned and imposed into the existing structure to ensure fitment and minimise any delays on site during installation.
  • Using the thickness testing data the existing silo was engineered to be removed in one section
  • Transportation of the over sized loads from LGM to Tronox, Coke silo transported in 2 sections
  • Site pre-works consisted of fabrication of the 2 coke silo halves, structural steel modifications, scaffolding and electrical works.
  • Temporary bypass works for Coke Storage and delivery systems, due to the need for coke supply to the chlorinator to be maintained during the shutdown
  • Removal of electrical cables, structural steel and platforms, bag house and piping from the top of the silo
  • Removal of the existing coke silo and the fitment of new silo
  • Reinstallation of existing structural steel, platforms, bag house and piping and reinstatement all electrical cables
  • Commissioning

Laminex 2019 Major Shut

  • Client:

    Laminex Group
  • Project:

    2019 Major Shut
  • Location:

    Bunbury, WA

  • Date:

    2019

Laminex 2019 Major Shut

Shutdown Maintenance

  • Client:

    Laminex Group
  • Project:

    2019 Major Shut
  • Location:

    Bunbury, WA

  • Date:

    2019

What We Did:

Supplied Supervision, Labour and Tooling for the 2019 Major Shutdown. The shutdown ran for 12 days and LGM supplied 16 trades.

TW Power Services Collie A

  • Client:

    TW Power Services
  • Project:

    Collie A Shutdown
  • Location:

    Collie, WA

  • Date:

    2020

TW Power Services Collie A

Shutdown Maintenance

  • Client:

    TW Power Services
  • Project:

    Collie A Shutdown
  • Location:

    Collie, WA

  • Date:

    2020

What We Did:

Execution of Capital Projects as well as supplying labour support during the 2020 Outage.
 Approximately 13,000 man-hours.

Iluka Major Maintenance Outage

  • Client:

    Iluka Resources Limited
  • Project:

    Iluka Major Maintenance Outage
  • Location:

    Capel, WA

  • Date:

    2017 & 2019

Iluka Major Maintenance Outage

Shutdown Maintenance

  • Client:

    Iluka Resources Limited
  • Project:

    Iluka Major Maintenance Outage
  • Location:

    Capel, WA

  • Date:

    2017 & 2019

What We Did:

LGM have provided maintenance services for both the 2017 and 2019 Major Maintenance Outages. Peak work crew for the 2019 outage was 95 people with approximately 25,000 man-hours.