LGM Industries was awarded a Structural, Mechanical, and Piping (SMP) package for a tailings break tank. LGM coordinated the engineering, surveying, shop detailing, fabrication, and installation.

 

The scope of work for this project included:

    • Designed and constructed to API650

    • 10m diameter x 10m tall, rubber lined tank

    • 630,000L capacity

    •  Oversize deliveries requiring Police escort

    • Coupled to existing structure and pipework

    • Construction was performed while surrounding plant was operational

Next project

Chemical Storage Tank

See project