Nammuldi Above Ground Piping

Scope: 
Structual, Mechanical & Piping
Client: 
Rio Tinto
Location: 
Tom Price, WA

LGM was engaged by Kerman contracting to carry out Mechanical and Piping works for Separable Portion 1 –  HME Workshop, Bulk Lube Facility, Service Truck Filling, HME Wash-down,  Retention Ponds and Stand Pipe , including the following:

  • Installation of all above ground piping supports and clamps including 2 no x 600 mm cable tray
  • Lube Piping and Air Piping from Lube Facility, Workshop and Service Truck Loading
  • Water Services Including Raw, Potable, Fire and Contaminated Water
  • Installation of all above ground water piping including: hose reels, wash down reels, fire booster cabinet, fire pump package, potable water treatment package, waste water treatment package and safety showers.
  • Heavy Vehicle Wash Down including: wash down pump skid, disinfection module and foam skid mounted units, Oily Water Separator, Cannons, overflow sump pit pumps and sump pump stations
  • Retention Ponds & Stand Pipes
  • Trench Flush System including Installation of all above piping and spray nozzles. 

Separable Portion 2 –  Fixed Plant Workshop, Admin and ERO Buildings

  • Compressed Air including system, piping and hose reels.
  • Water Services Including Raw, Potable, Fire and Contaminated Water
  • Installation of all above ground water piping including, fire hose reels and wash down reels, waste water treatment package, safety showers
  • Trench Flush System including Installation of all above piping and spray nozzles. 

Separable Portion 3 – Ammonia Nitrate Storage Building

  • Installation of hoppers and augers