Dry bottom Ash Handling System

Scope: 
Structual, Mechanical & Piping
Client: 
Synergy
Location: 
Muja Power Station

LGM was engaged by HRL Technology to carry out the Mechanical and Civil Installation, required for the removal of the existing Wet Ash Hopper System and Replace with a new Dry Bottom Ash Handling System, including the following Tasks:

  • Concrete Foundations
  • Removal of the existing old wet Ash Hopper System
  • Installation of Ash Silo & Structure
  • Install of a New Sluice system
  • Install of a New Ash hopper
  • Install new Clinker crusher
  • Install new Conveyor system 

The project was a success with zero incidents, completed on time and to the budget.