AB Lift Cladding

Scope: 
Construction & Maintenance
Client: 
Synergy
Location: 
Muja Power Station

LGM was engaged by Synergy to develop a new cladding system that met Australian Standards, fabricate this cladding system and install it. Fabrication involved shop testing the proposed new cladding system to ensure it met load and deflection requirements as per the relevant Australian Standards. Installation required careful removal of the old cladding panels as the work crew were dealing with Lead based paints on the existing lift shaft columns, as well as an open lift shaft during the transition between old and new cladding panels.